| Press Room: Front Royal VA Project |
| Client: |
|
| Location: |
Front Royal, Virginia |
|
Universal Wrecking Corporation was tasked with the controlled demolition of a large manufacturing building for Avtex Fibers. All employees were in Level C PPE due to the presence of chemical contamination. Stage of the controlled demolition were:
Phase I - preparation of building which included gut out and cutting of beams.
This work structurally weakened the building.
Phase II - Charges were strategically placed for the implosion of the building
Phase III - Implosion of building was completed in a safe and efficient manner
Phase IV - Cleanup of building steel and debris
DURATION: 1 months
EQUIPMENT:
Equipment utilized for this project included
- A Cat 330L Excavator with a hydraulic hammer attachment
- A Cat 330 Excavator with LaBounty Grapple attachment
- A Cat 350 Excavator with LaBounty MSD 100 Shear attachment
- A 110 hydraulic crane
- Bobcat 773 Skid Steer with demo grapple
- Bobcat 773 Skid Steer with hammer attachment
- Various support equipment
- 8 employees consisting of operators and laborers
All work was completed safely and on schedule
|
| List All Projects |
|
|